ENAR Conceptual Compression Study*

220px-Oil_and_Gas_Development_Company_Limited_(logo).jpg

Client: OGDCL (Oil & Gas Development Company Limited)

Field (Type): Qadipur (Gas, Onshore Pakistan)

Project Name: ENAR Conceptual Compression Study

Value Added: Improved development roadmap (including installation schedule); Enhanced production


PROJECT DESCRIPTION:

  • Duration: 4 - 5 months

  • Role: Project/Study Engineering (Engineering Consultant)

  • Disciplines involved: Rotating Equipment Engineering, Process Engineering and Project/Study Management

  • Project interfaces: Direct with end client

DELIVERABLES:

  • Investigate field development options especially the deployment of used centrifugal compressor units from a defunct site in tandem with existing reciprocating compression systems.

  • Investigate existing field development plans and recommend improvements

  • Carry out technical review of existing installation schedule for process gas compression units

  • Carry out technical analysis of future machinery sparing philosophies

  • Appraise field development options with a view to selecting the optimum and most cost-effective solution

  • Develop comprehensive field development road map with newly recommended development scheme