Magnus System Improvement Study*

BP.png

Client: BP

Field (Type): Magnus (Oil; Offshore UK)

Project Name: Magnus System Improvement Study

Value Added: Phased recommended improvement approach; Cost-effective refurbishment and de-staging of existing pumps; Demonstrable improvements to operability, reliability and integrity


PROJECT DESCRIPTION:

  • Duration: Approximately 2-3 months

  • Role: Project Management

  • Disciplines involved: Rotating Equipment Engineering and Project Management.

  • Project interfaces: Direct with end client

DELIVERABLES:

  • Appraise existing pumping system

  • Recommend feasible options to improve its reliability, operability and integrity

  • Recommend options to facilitate life extension of asset for future operations

  • Carry out design reviews of existing pumping system

  • Carry out in-service performance review of existing pumping system

  • Carry out process modelling and simulation of existing pumping system as well as future designs and configurations

  • Recommend phased approach for implementing recommended improvement options