CONCEPTCOMPRESSOR™ · SELECT

Select the right compression concept before the wrong one becomes expensive to reverse.

CONCEPTCOMPRESSOR™ is ETA's structured decision tool for evaluating compression location, timing, capacity, technology, configuration and life-of-field performance before major capital is committed.

Use it when...
Future production requires compression but the optimum concept is unclear.
Location
Wellhead, nodal, hybrid or centralised?
Timing
When should compression be introduced?
Configuration
How should the system evolve through field life?
The Decision It Protects

Compression concept selection is one of the hardest decisions to undo later.

A concept can meet today's design point while becoming inefficient, oversized, capacity-limited or operationally inflexible as pressure and production decline.

CONCEPTCOMPRESSOR™ tests options against the field's changing requirements rather than selecting a machine around a single duty.

The tool is designed to prevent:

  • Premature commitment to one compression concept
  • Over-specifying capacity and complexity
  • Under-specifying future operating range
  • Ignoring network and reservoir interactions
  • Poor phasing of compression CAPEX
  • Selecting equipment around one design point
  • Failing to consider life-of-field flexibility
The Five-Step Process

CONCEPTCOMPRESSOR™

01
Opportunity Identification
Identify production opportunities, constraints and compression requirements.
02
Options Analysis
Generate and screen technically feasible development options.
03
Shortlist Analysis
Evaluate leading options in greater technical and economic depth.
04
Concept Proof
Test the preferred concept across life-of-field scenarios.
05
Development Roadmap
Define the recommended concept, phasing and route into project definition.
What Can Be Evaluated

More than compressor technology

LOC
Compression Location
Wellhead, nodal, hybrid and centralised alternatives.
IAM
Integrated Asset Behaviour
Reservoir, well, network and compressor interactions.
ΔP
Pressure Sensitivities
Impact of declining wellhead and suction pressure.
CFG
Train Configuration
Unit count, redundancy, parallel/series operation and staging.
DRV
Driver Selection
Electric, gas turbine and gas engine implications.
£
Economics
Production benefit, CAPEX, OPEX and project phasing.
Typical Outputs

A defensible compression development decision

Preferred compression concept
The technically and commercially strongest option.
Life-of-field operating envelope
How duties change through field decline.
Compression timing
When investment should be introduced.
Package configuration
Unit count, sizing, staging and flexibility.
Option comparison
Technical and commercial decision evidence.
Development roadmap
Route into pre-FEED, FEED and procurement.
Relevant Proof

Integrated modelling supporting a field-development decision

ROSNEFT · ROSPAN ASSET
Integrated Asset Modelling & Conceptual Design
Field-development analysis supporting compression decisions.

The decision was being held back by an ineffective modelling workflow.

ETA engineer rebuilt the integrated asset modelling approach to provide a more practical basis for field-development and compression concept evaluation.

Outcome
Simulation cycle reduced from approximately one week to less than four hours.

Deciding what compression your field will need next?

CONCEPTCOMPRESSOR™ is designed for decisions that need to remain right as pressure and production conditions change.