CONCEPTCOMPRESSOR™ · SELECT

Select the right compression
concept before the wrong one becomes expensive to reverse.

CONCEPTCOMPRESSOR™ is ETA's structured decision tool for evaluating compression location, timing, capacity, technology, configuration and life-of-field performance before major capital is committed.

Use it when...

Future production requires compression but the optimum concept is unclear.

Location

Wellhead, nodal, hybrid or centralised?

Timing

When should compression be introduced?

Configuration

How should the system evolve through field life?

THE DECISION IT PROTECTS

Compression concept
selection is one of the
hardest decisions to
undo later.

A concept can meet today's design point while becoming inefficient, oversized,
capacity-limited or operationally inflexible as pressure and production decline.

CONCEPTCOMPRESSOR™ tests options against the field's changing
requirements rather than selecting a machine around a single duty.

The tool is designed to prevent:

  • ✓ Premature commitment to one compression concept
  • ✓ Over-specifying capacity and complexity
  • ✓ Under-specifying future operating range
  • ✓ Ignoring network and reservoir interactions
  • ✓ Poor phasing of compression CAPEX
  • ✓ Selecting equipment around one design point
  • ✓ Failing to consider life-of-field flexibility
THE FIVE-STEP PROCESS

CONCEPTCOMPRESSOR™

01
Opportunity
Identification

Identify production
opportunities, constraints and
compression requirements.

02
Options Analysis

Generate and screen
technically feasible
development options.

03
Shortlist Analysis

Evaluate leading options in
greater technical and economic
depth.

04
Concept Proof

Test the preferred concept
across life-of-field scenarios.

05
Development Roadmap

Define the recommended
concept, phasing and route into
project definition.

WHAT CAN BE EVALUATED

More than compressor
technology

LOC
Compression Location

Wellhead, nodal, hybrid and centralised
alternatives.

IAM
Integrated Asset Behaviour

Reservoir, well, network and compressor
interactions.

ΔP
Pressure Sensitivities

Impact of declining wellhead and suction
pressure.

CFG
Train Configuration

Unit count, redundancy, parallel/series operation
and staging.

DRV
Driver Selection

Electric, gas turbine and gas engine implications.

£
Economics

Production benefit, CAPEX, OPEX and project
phasing.

TYPICAL OUTPUTS

A defensible compression
development decision

Preferred compression concept

The technically and commercially strongest option.

Life-of-field operating envelope

How duties change through field decline.

Compression timing

When investment should be introduced.

Package configuration

Unit count, sizing, staging and flexibility.

Option comparison

Technical and commercial decision evidence.

Development roadmap

Route into pre-FEED, FEED and procurement.

RELEVANT PROOF

Integrated modelling supporting a
field-development decision

ROSNEFT · ROSPAN ASSET
Integrated Asset Modelling &
Conceptual Design

Field-development analysis supporting compression
decisions.

The decision was being held back by an ineffective
modelling workflow.

ETA rebuilt the integrated asset modelling approach to provide a more practical basis for
field-development and compression concept evaluation.

OUTCOME
Simulation cycle reduced from approximately one week to less than four
hours.
RELATED SERVICE

Gas Compression
Strategy, Concept
Selection & Integrated
Asset Modelling

Tool vs service

CONCEPTCOMPRESSOR™ is the decision methodology. The
broader engineering service may also include integrated asset
modelling, hydraulic analysis, conceptual engineering, cost
estimation and business-case support.

Explore Related Service →

Deciding what compression your
field will need next?

CONCEPTCOMPRESSOR™ is designed for decisions that need to remain right as pressure and
production conditions change.