modgas™ · Redesign

Before replacing the system,find out how much capacityis still hidden inside it.

modgas™ is ETA's structured debottlenecking and major-modification decision tool for determining how existing gas compression and production facilities can be modified, reconfigured or operated differently to unlock additional capacity.

Use it when...
The facility is constrained but a full replacement may not be justified.
Bottleneck
Where is capacity actually being lost?
Modification
What is the least disruptive technical solution?
Value
How much production can the change unlock?
THE DECISION IT PROTECTS

New equipment
should not be the
default answer to
every production
constraint.

Mature facilities often contain recoverable capacity that is hidden by network
pressure losses, compressor mismatch, changed operating conditions or
outdated operating philosophy.

modgas™ systematically identifies what is actually limiting deliverability before
the redesign is defined.

The tool is designed to prevent:

  • ✓ Replacing equipment before identifying the real bottleneck
  • ✓ Moving a bottleneck from one part of the system to another
  • ✓ Ignoring hydraulic constraints
  • ✓ Discarding reusable compressor capacity
  • ✓ Missing rewheel or reconfiguration opportunities
  • ✓ Implementing modifications without quantifying production
    benefit
THE FIVE-STEP PROCESS

modgas™

01
Requirements
Identification

Define current and future
operating and production
requirements.

02
Performance
Benchmarking

Establish current facility and
compression performance.

03
Bottleneck
Identification

Locate restrictions limiting
production and deliverability.

04
System Redesign

Develop and compare technical
modifications.

05
Redesign Definition

Produce an implementable
basis for major modification
work.

WHAT CAN CHANGE

The answer may be smaller than a
new compression train

PIPE
Pipeline / Network Changes

Reduce avoidable hydraulic losses or remove
flow restrictions.

RW
Compressor Rewheel

Better match the machine to changed operating
conditions.

CFG
Train Reconfiguration

Change series/parallel operation, load sharing or
staging.

OP
Operating Philosophy

Unlock capacity through changed operating limits
or procedures.

USE
Existing Equipment Reuse

Repurpose assets rather than defaulting to new
CAPEX.

ADD
Additional Compression

Introduce new compression only where the
system analysis justifies it.

TYPICAL OUTPUTS

An implementable production-
capacity roadmap

Performance baseline

Current deliverability and compression performance.

Bottleneck register

Constraints ranked by impact.

Redesign options

Technically feasible modification alternatives.

Production benefit

Capacity unlocked by each intervention.

Cost-benefit comparison

Technical value against required investment.

Modification basis

Definition sufficient to progress implementation.

RELATED SERVICE

Production
Debottlenecking &
Compression System
Redesign

modgas™ is the decision process.

The wider service can include network hydraulics, integrated
modelling, compressor performance analysis, modification
engineering and business-case support.

Explore Related Service →

Are you about to buy capacity you
may already own?

modgas™ is designed to establish the real constraint before major replacement CAPEX is
committed.