modgas™ · Redesign

Before replacing the system, find out how much capacity is still hidden inside it.

modgas™ is ETA's structured debottlenecking and major-modification decision tool for determining how existing gas compression and production facilities can be modified, reconfigured or operated differently to unlock additional capacity.

Use it when...
The facility is constrained but a full replacement may not be justified.
Bottleneck
Where is capacity actually being lost?
Modification
What is the least disruptive technical solution?
Value
How much production can the change unlock?
The Decision It Protects

New equipment should not be the default answer to every production constraint.

Mature facilities often contain recoverable capacity that is hidden by network pressure losses, compressor mismatch, changed operating conditions or outdated operating philosophy.

modgas™ systematically identifies what is actually limiting deliverability before the redesign is defined.

The tool is designed to prevent:

  • Replacing equipment before identifying the real bottleneck
  • Moving a bottleneck from one part of the system to another
  • Ignoring hydraulic constraints
  • Discarding reusable compressor capacity
  • Missing rewheel or reconfiguration opportunities
  • Implementing modifications without quantifying production benefit
The Five-Step Process

modgas™

01
Requirements Identification
Define current and future operating and production requirements.
02
Performance Benchmarking
Establish current facility and compression performance.
03
Bottleneck Identification
Locate restrictions limiting production and deliverability.
04
System Redesign
Develop and compare technical modifications.
05
Redesign Definition
Produce an implementable basis for major modification work.
What Can Change

The answer may be smaller than a new compression train

PIPE
Pipeline / Network Changes
Reduce avoidable hydraulic losses or remove flow restrictions.
RW
Compressor Rewheel
Better match the machine to changed operating conditions.
CFG
Train Reconfiguration
Change series/parallel operation, load sharing or staging.
OP
Operating Philosophy
Unlock capacity through changed operating limits or procedures.
USE
Existing Equipment Reuse
Repurpose assets rather than defaulting to new CAPEX.
ADD
Additional Compression
Introduce new compression only where the system analysis justifies it.
What Can Change

The answer may be smaller than a new compression train

PIPE
Pipeline / Network Changes
Reduce avoidable hydraulic losses or remove flow restrictions.
RW
Compressor Rewheel
Better match the machine to changed operating conditions.
CFG
Train Reconfiguration
Change series/parallel operation, load sharing or staging.
OP
Operating Philosophy
Unlock capacity through changed operating limits or procedures.
USE
Existing Equipment Reuse
Repurpose assets rather than defaulting to new CAPEX.
ADD
Additional Compression
Introduce new compression only where the system analysis justifies it.

Are you about to buy capacity you may already own?

modgas™ is designed to establish the real constraint before major replacement CAPEX is committed.