Your reservoir pressure is falling. What compression will the field need next?
ETA helps oil & gas operators determine when compression should be introduced, where it should be located, what capacity is required and how the system should evolve as reservoir and wellhead pressure decline.
- Wellhead / nodal / centralised options
- Integrated asset modelling
- Life-of-field analysis
- CAPEX / OPEX considered
The core question
How do we sustain production as natural deliverability declines?
What?
What compressor duty, configuration and driver are required?
Where?
Wellhead, nodal, hybrid or centralised compression?
When?
When should compression come online to protect production value?
The optimum compressor today may not be the optimum system tomorrow.
As reservoir and wellhead pressure decline, production rates, suction conditions, compression ratios, power requirements and operating envelopes all change.
Selecting a compressor around one design point can therefore create inefficient or inflexible equipment later in field life. The decision needs to be made across the production system and across time.
You may be asking...
- When will natural production cease to meet our target?
- Can debottlenecking delay the need for compression?
- Where should compression be introduced?
- How low should suction pressure ultimately go?
- How many trains are required?
- Do we need different stages later in field life?
- Which concept best protects production and reserves?
- Which option offers the strongest life-of-field economics?
Typical triggers for a future-compression study
Plateau is becoming difficult to maintain
Declining pressure is beginning to reduce deliverability or threatens contractual gas volumes.
A compression project appears inevitable
But location, timing, capacity and phasing have not yet been independently established.
Management needs a defensible business case
The technical need must be connected to production benefit, CAPEX, OPEX and implementation timing.
Build the compression decision from the production system outward
Model the Production System
Integrate reservoir, wells, gathering network, processing facilities and compression to understand how future conditions affect production.
Develop Feasible Concepts
Compare wellhead, nodal, centralised and hybrid strategies, including package capacity, staging and redundancy.
Test Pressure Sensitivities
Understand how suction pressure, reservoir decline and production forecast assumptions change the optimum solution.
Define Configuration
Determine number of trains, operating philosophy, future series or parallel requirements and driver strategy.
Compare Economics
Connect technical alternatives to CAPEX, OPEX, production recovery and project phasing.
Build the Roadmap
Define what should be installed, when it is needed and how the compression system should evolve over field life.
From pressure decline to a defensible development strategy
Understand Decline
Establish production targets, forecast and pressure trajectory.
Model the System
Integrate reservoir, wells, network and compression behaviour.
Evaluate Concepts
Compare locations, technologies and configurations.
Test Economics
Compare production value, CAPEX, OPEX and implementation timing.
Define Roadmap
Recommend the optimum life-of-field compression strategy.
More than a compressor recommendation
Compression timing
When compression becomes technically and economically justified.
Preferred location
Wellhead, nodal, centralised or hybrid strategy.
Required capacity
Duty and operating envelope over field life.
Configuration philosophy
Train count, staging, redundancy and future flexibility.
Economic comparison
CAPEX, OPEX and production implications.
Development roadmap
A technically defensible route into pre-FEED and FEED.
Gas Compression Strategy, Concept Selection & Integrated Asset Modelling
The engineering response is typically delivered through CONCEPTCOMPRESSOR™ with Extraclarity™ used where project framing, objectives or scope require clarification first.
Relevant methodologies
Where network constraints are significant, modgas™ analysis may also be incorporated before additional compression is recommended.
Explore the Service →How long can your field sustain production before compression is needed?
Share the pressure decline, production objective and existing infrastructure. ETA can help determine what compression is required, where and when.
Discuss Your Compression Strategy →30 minutes · No obligation · Independent advice · NDA available